Showing posts with label IE. Show all posts
Showing posts with label IE. Show all posts

Industrial Engineering Duties and Responsibilities in the apparel Industry


Industrial Engineering 

Apparel manufacturing plays a vital role in the development of countries economy, because of exporting garments to other and the constant growth of foreign exchange i increased.

Now a days Ready made industries are also is increased rapidly. So, the apparel engineers duties and responsibilities are most important in the apparel industry.

Industrial Engineering Duties and Responsibilities in the apparel Industry
Industrial Engineering

Industrial engineering maintains those following activities:
  1. Time study
  2. Make floor layout
  3. SMV calculation
  4. Operator performance report
  5. Train up production staff on the efficiency
  6. Process wise operator skill development
  7. Non productive time record and reduce
  8. Hourly production monitoring and achieve the line target
  9. Prepare man machine report
  10. Production planning and control
  11. Taking the capacity study of the full line
  12. Line balancing
  13. Identifies the Bottleneck area
  14. Methods developments and improved quality and production capacity
  15. Follow up for the increase operators performance
  16. Operation breakdown
  17. Operation bulleting
  18. Planning calculation
  19. Capacity study
  20. Production study
  21. Wastage reduces
  22. CPM, CM calculation
  23. Line cost calculation
  24. Floor capacity calculation
  25. SPM, EPM, PCL calculation
  26. Operator, line and floor capacity calculation
  27. Provide incentive for operator and production staff
  28. Eliminating excess manpower




Time Study | Elements OF Time Study


Time study

Time study measure the maximum necessary time required to do the job responsibility. It can be defined as time study is the technique for determining as accurately as possible from a limited number of observations.

Time Study | Elements OF Time Study
Time Study

Objectives of Time Study

  • To determine standard time during which the operation can be performed efficiency
  • To determined scheduling and planning
  • To calculate fair production per hours
  • Help to the motion study of the job
  • To achieve uniform flow of work

Element of used in the Time Study

Stop watch: Stop watch is the element which used in the time study. There are types of method can be used. 

There are 1. Fly back, 2. Continuous

This watch can be used in any of the time scales-

  1. Seconds
  2. Decimal minutes
  3. Decimal hours

Following tools may also be used
  1. Time study board
  2. Time study form
  3. Ruler
  4. Pencil